← All methods

AVZ-20D vacuum pump

The vacuum pump is not among the 24 procedures of the instruction — this is a separate applied development. The effect is visible in the residual pressure and the pumping speed.

AVZ-type vacuum pump (AVZ-20D) running on VM-1 vacuum oil

Vacuum pumps have no procedure of their own in the instruction. The XADO engineer set 3.0 ml per litre — twice the norm for compressors; for a new pump, a tube per stage is given instead of a share per litre. Rolling bearings, oil-lubricated →

What is treated

What is measured before and after

ParameterInstrumentHow and when
Pumping speed, l/s (m³/min)standard measuring equipment
Residual pressure, mmHgvacuum gauge
Power consumption, kWclamp meter, wattmeter

Dosage rates

CompoundRateHow and when
Gel for compressors and bearings — worn pump3.0 ml per 1 litre of the standard oilWarm 100–150 ml of VM-1 oil to 40–50 °C and dissolve the gel in it.
Gel for power steering — new pump1 tube of 9 ml per stage, 3 tubes in totalSecond revision of the procedure, for a pump that has not been run in.

Treatment stages

  1. Add the first dose to the oil bath of the pump.Start of the operating-hours count
  2. Second dose.After 8 hours of cumulative operating time
  3. Third dose.After another 8 hours

After treatment

Points to watch

Where АВЗ-20Д has already been treated

  1. Tatneft JSC, Almetyevsk TTD-1 · 2001↑ 10-15% — compression across cylinders, 3.0-11.0 → 6.0-11.7 kgf/cm²

Source: XADO applied procedure, lead engineer I. N. Sharaikin. Class norm — instruction IE-24.6-25612000-005-2008, procedure No. 9. Analysis: state/DRIVE_METHODS.md.